plumbing contant 1.22

=============================

=================

Piping Services At Green bay WI
Plumbers Avoid Leaky Pipes
Closed Circuit camera inspection tools (CCTV), inspect broken or deteriorating pipe-lines to analyze the problem region normally invisible by the standard television equipment. Lateral Camera LETS (Line launched lateral evaluation television System) is an independent and a transferable unit for analyzing sewer and drains service laterals, remotely working from a main sewer line. Line Cleaning,superior hydraulic cleaning tools uses a good range of application nozzles, flushing systems and optimal pressure to remove blockages as well as restore the pipe flow to its full capacity.
Cured-In-Place Pipe (CIPP)
No excavation is needed for this truly trench less monolithic pipe-within-a-pipe application. With the help of premium felts and resins, Green bay Plumbers rehabilitates structurally and declines pipe lines quickly, economically and in an environmentally-friendly manner. CIPP Internal Point Repair is non-disruptive techniques for mending localized problems of structural in or else sound pipe. CIPP repair technique recuperates the damaged pipe from 6-24 inches in diameter and up to 10 feet in length without digging. PVC Segmented Slip Lining is no joints regenerate the existing pipes among a fast-to-install, low-cost structural pipe. Green bay Plumber can fix ‘SPVC’ without a cumbersome complete pipeline bypass, as required by other processes, and minimizes traffic control accordingly. We offer a complete range of bathroom services. Structural Rehabilitation involves any of the following techniques: dam restoration, slab jacking/stabilization, manhole sealing/coating, pressure soil/ grouting stabilization, epoxy injection, joint caulking and crack sealing. So do not get flabbergasted, just call plumbers if you are facing some pipe problems.=========
==================
Drainage Tips From Green bay Plumbers
Drainage Renovation At Green bay WI
The third component in a plumbing system is the drainage system, more properly called the DWV or drain-waste-vent system, to describe the functions it performs: draining away wastes and venting gases at the same time. Generally, the system consists of the soil stack, the waste pipes, the traps, and the vents. In operation, waste first runs out of the fixtures, say a sink. From there it enters the waste pipes, usually 1½-inch to 2-inch diameter pipes, which are sloped and lead to the soil stack. The stack is a large-diameter pipe that runs vertically from the lowest point in the plumbing system to above the roof and out the roof. In older homes, 4-inch cast iron pipe is most commonly used. In modern homes, you will find 3-inch copper tube and 4-inch ABS (acrylonitrile-Butadiene styrene) and PVC (polyvinyl chloride) plastic pipe used. The waste then runs down the soil stack, or stack, as it is commonly called, which in turn leads to the building drain, then to the sewer line, which leads to the city sewer line, cesspool, or septic system.
As a safety measure against gases backing up into the house, all fixtures are equipped with traps (van-shaped pipe sections) directly under them, where water is trapped (hence the name trap). These provide a seal against gases and vermin getting into the house through drains. Toilets have built-in traps (toilets also have waste pipes that lead directly to the soil stack). The most common types of traps are “P” and “S” types, so named for their shapes. There are also a house trap and a fresh air inlet where the soil pipe leaves the building. Greenbay Plumbers suggests that plumbing system must be vented for three reasons:
(1) it lets potentially dangerous sewer gases escape
(2) it equalizes air pressure in the system so that waste and water can flow freely
(3) it prevents the backup of water into a fixture that is located below another fixture that happens to be draining.
Each plumbing fixture performed at any Greenbay WI house is connected either to the main stack, or to smaller stacks (where the pipe would have to be run too far to reach the main stack) project through the roof: the entire system is open to the outside air. The stack itself serves as a double purpose fixture: the bottom section below the fixtures is a waste line, and the portion above is designated as a vent. At the base of each soil stack there is a cleanout plug. And handy they are. For instance if you cannot clear a drain blockage with the help of a snake, you can attack it lower down in the pipe by just removing the cleanout plug and inserting your snake in there. Cleanouts should also be located at each change in direction of the waste line, where the chance is greater that blockage will occur.
 
=======================
 A basin (lavatory) is installed just as a sink is, with the only difference being a pop-up drain. First, install the tail piece. Install the pop-up drain as you would a sink strainer, making sure that the bottom part is pointed in the right direction—straight back at the wall. The flange should be on the inside and beaded in putty. On most new faucets the drain plug can be installed by twisting and pulling upward.

Urinals
The plumber is called upon to install a variety of urinals in public buildings. If one has a choice, the kind that should be recommended is one made of vitreous china or earthenware; wooden ones are absorbent and become fouled, and those made of iron get pitted by corrosive action. Generally, three kinds of urinals are commonly found: trough, wall-hung and stall. The trough type may be 24, 36, 48, or 60 inches long, and is usually 8 inches deep and 12 inches wide, with the bottom of the trough approximately 22 inches from the floor. Wall-hung urinals, like the trough type, have the bowl mounted on the wall. The shape, generally, is either round or lipped, with the lipped shape being preferable. Two methods of flushing are commonly used— wash down and siphon-jet. If the urinal is the lip type, the flushing rim is preferred, because its action cleans the bowl completely. The stall urinal is made of vitreous china, is set against the wall, and is sloped so that wastes can drainage system easily. A rim-type flushing action cleanses the urinal after use. Usually, stall urinals come in braces of three, but they may be set together as needed, with the space sealed with cement, plaster of Paris, or some other waterproof, durable material.

Drinking Fountains
The Greenbay Plumber noticed that two types of fountains are most common: the wall and the pedestal types. As the name implies, the wall-hung fountain is mounted on a wall; the pedestal type is mounted on a floor. They are usually made of vitreous china in a wide variety of styles. Installation of wall or pedestal drinking fountains varies greatly. Usually, the water supply is controlled by a valve at the spout opening and a self-closing compression stop. The valve avoids excessive waste of water. Traps on these fixtures are usually no more then.25 inches. The fountain may be connected to the plumbing system proper, or not. For screw pipe drains a riser of .5 inches is used; for soil pipe it should be 2 inches long.
=================
 
 

Leave a Reply